检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马智强 马胜国 陈亮 刘德志 董婧 马丽 MA Zhiqiang;MA Shengguo;CHEN Liang;LIU Dezhi;DONG Jing;MA Li(Marketing Service Center of State Grid Ningxia Electric Power Co.,Ltd.(Metering Center of State Grid Ningxia Electric Power Co.,Ltd.),Yinchuan 750000,Ningxia,China;Shenzhen Guodian Technology Communication Co.,Ltd.,Shenzhen 518109,Guangdong,China)
机构地区:[1]国网宁夏电力有限公司营销服务中心(国网宁夏电力有限公司计量中心),宁夏银川750000 [2]深圳市国电科技通信有限公司,广东深圳518109
出 处:《电网与清洁能源》2024年第4期112-117,126,共7页Power System and Clean Energy
基 金:国网宁夏电力有限公司科技项目(521975137926)。
摘 要:新能源微电网的停电负荷具有灵活而易于控制管理的特点。将停电负荷积极参与到微电网调度计划中,可有效提高微电网运行的稳定性。提出基于粒子群算法的新能源微电网局部停电负荷调度方法。构建用电信息采集模块,完成新能源微电网运行信息的采集,根据新能源微电网的实际运行情况,将NTP协议应用在信息采集系统中,实现数据的同步更新;构建局部停电负荷调度双层模型,并采用粒子群算法求解模型,实现新能源微电网局部停电负荷调度。由实验结果可知:在16:00之前风力出力持续升高,此时段设备的开机时序即生产负荷在优化后大部分向后移,说明所提方法能够充分利用风力能源,调节电网设备开机时序;调度后的新能源微电网在停电情况下,其总负荷和净负荷均有所降低,说明对微电网运行稳定性的改善效果非常显著。The outage load of the new energy microgrid is flexible and easy to be controlled and managed.Actively participating of the outage load in the microgrid dispatching plan can effectively improve the stability of the microgrid operation.Therefore,a local outage load scheduling method for new energy microgrids based on particle swarm optimization algorithm is proposed in this paper.The power consumption information acquisition module is constructed to complete the collection of operation information of the new energy microgrid.According to the actual operation of the new energy microgrid,NTP protocol is applied to the information acquisition system to realize the synchronous update of data.A double-layer model of local outage load scheduling is constructed,and the particle swarm optimization algorithm is used to solve the model to realize the local outage load scheduling of the new energy microgrid.The experimental results show that the wind power output of the proposed method is increasing before 16:00,and the start-up sequence of the equipment before 16:00,that is,most of the production load moves backward after optimization,which shows that the proposed method can make full use of wind energy and adjust the start-up sequence of the power grid equipment;After scheduling,the total load and net load of the new energy microgrid are reduced in case of a power outage,indicating a significant improvement in the stability of the microgrid operation.
关 键 词:用电信息采集系统 NTP协议 新能源微电网 局部停电负荷调度 粒子群算法
分 类 号:TK51[动力工程及工程热物理—热能工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13