检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周静[1] Zhou Jing(Taiyuan City Vocational College,Taiyuan 030027,China)
出 处:《北方交通》2024年第4期75-78,82,共5页Northern Communications
基 金:山东省自然科学基金面上项目(ZR2021ME004)。
摘 要:文章依托高速公路多层软土地基强夯处治项目,在施工现场选取具有代表性的监测断面开展现场监测,检验河谷区多层软土地基强夯处治效果。由监测数据得出,在强夯处治和路基填筑施工阶段,地基分层沉降、土压力、孔隙水压力和侧向位移增幅均较大,工后逐渐趋于稳定,可说明强夯处治后软基承载力得到有效提升,路基整体结构稳定,加固效果良好。Based on the dynamic compaction treatment project of multi-layer soft soil foundation of expressway,the on-site monitoring is carried out by selecting the representative monitoring sections at the construction site,so as to test the effectiveness of the dynamic compaction treatment for the multi-layer soft soil foundation in the river valley area.According to the monitoring data,during the stages of dynamic compaction treatment and roadbed filling construction,the layered settlement of foundation,soil pressure,pore water pressure and lateral displacement all increase significantly,and gradually stabilize after construction.It indicates that the bearing capacity of the soft foundation is effectively improved after the dynamic compaction treatment,the overall structure of the roadbed is stable,and the reinforcement effect is good.
分 类 号:U416.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.176.186