青岛地铁4号线多等级减振预制道床施工技术研究  

Research on Construction Technology of Multi-Grade Vibration Reduction Prefabricated Ballast Bed for Metro Line 4 in Qingdao

在线阅读下载全文

作  者:朱福民 ZHU Fu-min(China Railway 11th Bureau Group Third Engineering Co.Ltd.,Shiyan 442000,China)

机构地区:[1]中铁十一局集团第三工程有限公司,湖北十堰442000

出  处:《工程建设与设计》2024年第8期118-120,共3页Construction & Design for Engineering

摘  要:青岛地铁4号线在张彭右线设计有216 m的多等级减振预制道床实验段,论文从组合减振单元、道床结构设计、减振等级及调整、自密实混凝土等方面对多等级减振预制道床施工技术进行研究。该道床实验段优化了组合减振单元施工工艺,避免了现场单元组合施工,改进了道床结构设计,采用自密实混凝土,提高了现场施工环境和道床施工质量。Qingdao Metro Line 4 has designed a 216 m multi-grade prefabricated ballast test section on Zhangpeng right line.This paper studies the construction technology of multi-grade prefabricated ballast from the aspects of combination damping unit,ballast structure design,vibration reduction grade and adjustment,self-compact concrete,etc.In the test section of the ballast bed,the construction technology of the combined damping unit is optimized,the combined construction of the on-site unit is avoided,the structural design of the ballast bed is improved,and the construction environment and construction quality of the ballast bed are improved by using self-compacting concrete.

关 键 词:地铁工程 轨道施工 多等级减振预制道床 

分 类 号:U231.3[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象