作 者:李宁 LI Ning(China Railway 18th Bureau Group First Engineering Co.,Ltd.,Zhuozhou,Hebei 072700,China)
机构地区:[1]中铁十八局集团第一工程有限公司,河北涿州072700
出 处:《施工技术(中英文)》2024年第9期127-131,150,共6页Construction Technology
基 金:中铁十八局集团有限公司科技研发计划(2020⁃43)。
摘 要:隧道穿越强风化花岗岩地层时,易发生突水突泥等灾害,严重影响隧道施工安全。以厦门第二西通道工程为研究对象,通过采用超前地质预报手段对不良地质进行预测,其中BZK15+270—BZK15+300区段处于透水性强、自稳能力差的碎块状强风化花岗岩地层。针对隧道穿越F6风化槽的施工难点,提出长管棚和半断面帷幕注浆联合的支护方式,并根据检查孔状态、注浆量、注浆压力及注浆率验证帷幕注浆措施的有效性。When tunnels pass through strongly weathered granite formations,disasters such as water and mud bursts are prone to occur,seriously affecting the safety of tunnel construction.The Xiamen Second West Passage project was taken as the research object,and advanced geological prediction methods were used to predict unfavorable geology.Among them,the BZK15+270—BZK15+300 section is located in a fragmented strongly weathered granite formation with strong permeability and poor self stability.Aiming at the construction difficulties of tunnel passing through F6 weathering trough,a combined advanced support method of long pipe shed and half section curtain grouting is proposed,and the effectiveness of curtain grouting measures is verified based on the inspection hole status,grouting amount,grouting pressure and grouting rate.
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90