检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张文正 ZHANG Wenzheng
机构地区:[1]上海市政工程设计研究总院(集团)有限公司,上海市200092
出 处:《城市道桥与防洪》2024年第5期234-238,M0020,M0021,共7页Urban Roads Bridges & Flood Control
摘 要:随着轨道交通的发展,线网密度将会越来越大,导致换乘车站越来越多。新建换乘车站与既有车站衔接成为一个重要的设计内容,施工破除既有运营车站墙体成为一个重要关键的技术,一方面要保证既有线路运营安全,另一方面要保证既有地铁结构的受力在正常范围之内。以新建某地换乘车站为例,运用ANSYS有限元分析软件模拟凿除换乘节点侧墙的施工,求得既有结构的变形和内力变化,从设计和施工方面提出相应的技术措施。With the development of rail transit,the density of the line network will increase,which will lead to an increasing number of transfer stations.The connection between the newly built transfer station and the existing station has become an important design content,and the construction of abolishing the walls of the existing operating station has become an important key technology.On the one hand,it is necessary to ensure the safety of the existing line operation,and on the other hand,it is necessary to ensure that the stress of the existing subway structure is within the normal range.Taking a newly built transfer station as an example,ANSYS finite element analysis software is used to simulate the construction of chiseling out the side walls of transfer nodes in order to acquire the deformation and internal force changes of the existing structures.The corresponding technical measures are proposed from the design and construction aspects.
关 键 词:地铁车站 换乘节点 破除施工 有限元分析 沉降变形 内力分析
分 类 号:U231[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.142.124.64