检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:劳鹏飞 LAO Peng-fei(Wuhan Sanlian Hydropower Control Equipment Co.,Ltd.,Wuhan 430200,China)
机构地区:[1]武汉三联水电控制设备有限公司,湖北武汉430200
出 处:《水电能源科学》2024年第6期203-207,共5页Water Resources and Power
摘 要:针对灯泡贯流式机组大波动时调节系统分段关闭的局限性,提出了实时控制策略,即通过关闭过程中实时的转速变化调整导叶与桨叶的开度及开关方向,使机组转速控制在合理状态,满足规范要求。在国内近百台贯流式机组上的应用表明,该方法十分可靠,可为类似水电站大波动时,转速控制策略不当而造成的各类事故处理提供借鉴。A real-time control strategy is proposed to address the limitations of segmented shutdown of the regulating system in bulb tubular units during large fluctuations.This strategy involves adjusting the opening and switch direction of the guide vanes and blades in real time through changes in speed during the shutdown process,in order to control the unit speed in a reasonable state and meet regulatory requirements.This method has been applied to nearly a hundred tubular units in China and has been proven to be very reliable.Considering the various accidents and malfunctions caused by improper speed control strategies during large fluctuations in hydropower stations,this article is written to provide readers with insights.
分 类 号:TV734.4[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170