输电塔装配式钢结构基础数值模拟研究  

Numerical Simulation of Prefabricated Steel Structure Foundation for Transmission Tower

在线阅读下载全文

作  者:李牧 Li Mu(State Grid Zhejiang Electric Power Co.,Ltd.jiaxing electric power supply company,Jiaxing,China)

机构地区:[1]国网浙江省电力有限公司嘉兴供电公司,浙江嘉兴

出  处:《科学技术创新》2024年第16期9-12,共4页Scientific and Technological Innovation

摘  要:装配式基础是各类输电线路杆塔基础中施工周期最短的基础,该基础采用钢结构代替钢筋混凝土结构,利用高强螺栓连接成装配式钢结构输电塔基础。本文以吉林省辽源市东丰县五道岗变电站输电线路为工程实例,选取项目基建部所在地型号为SZ-1的66 kV铁塔作为工程实例对新型的装配式钢结构输电铁塔基础进行了结构分析和理论推导,为其在输电线路工程中的研究提供参考。The prefabricated foundation is the foundation with the shortest construction period among all kinds of transmission line tower foundation.The foundation adopts steel structure instead of reinforced concrete structure,and uses high-strength bolts to form the prefabricated steel structure transmission tower foundation.In this paper,the transmission line of Wudaogang Substation in Dongfeng County,Liaoyuan City,Jilin Province is taken as an example,and the 66 kV tower with model SZ-1 located in the infrastructure department of the project is selected as an example to carry out structural analysis and theoretical derivation of the new prefabricated steel structure transmission tower foundation,providing reference for its research in transmission line engineering.

关 键 词:带电作业 绝缘子更换 导线侧末端绝缘子 更换卡具 

分 类 号:TM75[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象