检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]AVIC Xi′an Flight Automatic Control Research Institute,Xi′an 710076,China
出 处:《International Journal of Plant Engineering and Management》2024年第2期65-77,共13页国际设备工程与管理(英文版)
摘 要:Based on the analysis of the development process system status of domestic and foreign civil aircraft airborne system suppliers,this paper proposes the overall construction idea of"a set of civil aircraft process system"based on IPD(Integrated product development)in the organization.The development stage,process,activity and task are the logical framework elements of the system construction."Based on process decomposition,vertical stratification,horizontal segmentation,combination of special and common,process customized to tools,role and process integration,giving full consideration to the interface between supplier management and process modules"etc.are the concrete ideas.Moreover,formulate top⁃level system construction standards,implemented by process system management tool platform,so that the process system and development work can be effectively integrated to effectively guide the development work of airborne system suppliers,and meet the quality and airworthiness requirements of civil aircraft development.Through the development application of a certain type of flight control system,the process system and tool platform were verified and optimized in practice.
关 键 词:development process system development assurance process integrated product development(IPD) development stage ACTIVITY
分 类 号:V24[航空宇航科学与技术—飞行器设计]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7