检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈鹰 Chen Ying(Sichuan Shenlan Electric Power Design and Research Institute,Chengdu,Sichuan,610072)
机构地区:[1]四川深蓝电力设计研究院,四川成都610072
出 处:《中国井矿盐》2024年第4期29-30,共2页China Well and Rock Salt
摘 要:某发电有限公司#4机组脱硫装置技改后,机组带负荷能力受限,具体表现为机组高负荷时,脱硫增压风机电流超限,锅炉燃烧恶化,飞灰可燃物含量大幅度增加,而其他3台机组没有出现该现象。为诊断造成目前机组带负荷能力受限的原因,测定现有#4脱硫增压风机的运行性能状况,实施#4脱硫增压风机进行性能试验,并提出了改善建议。After the technical modification of the desulfurization device of unit#4 of a power generation Co.,Ltd.,the load capacity of the unit is limited,which is reflected in the excessive current of the desulfurization booster fan,the deterioration of the boiler combustion,and the significant increase of the fly ash fuel content when the unit is high load,while the other 3 units do not appear this phenomenon.In order to diagnose the cause of the limited load capacity of the unit,the operating performance of the existing#4 desulphurization booster fan was measured,the performance test of the#4 desulphurization booster fan was carried out,and suggestions for improvement were put forward.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.135.125