天竺山一号隧道斜井进正洞挑顶施工技术研究  

Research on the Construction Technology of Roof Lifting in the Inclined Shaft into the Main Hole of Tianzhu Mountain No.1 Tunnel

在线阅读下载全文

作  者:刘玉勇 Liu Yuyong(China Railway 11th First Group Co.Ltd.,Wuhan,Hubei 430000)

机构地区:[1]中铁十一局集团有限公司,湖北武汉430000

出  处:《江西建材》2024年第4期297-300,共4页

摘  要:复杂地质条件长大隧道斜井进正洞挑顶施工难度大,安全风险高,交叉口处结构复杂多变,施工过程中多次应力转化,易出现坍塌事故。为降低大断面隧道挑顶施工安全风险,文中以天竺山一号隧道斜井进正洞段挑顶施工为例,采用横向棚洞法施工,阐述了斜井交叉口挑顶施工方案,该工法技术原理简单、操作性强,可为类似隧道的挑顶施工提供经验参考与技术指导。In complex geological conditions,the construction of long tunnel inclined shaft into the positive hole is difficult,and the safety risk is high.The structure at the intersection is complex and changeable,and the stress transformation is repeated during the construction process,which is prone to collapse accidents.In order to reduce the safety risk of large-section tunnel roof lifting construction,this paper takes Tianzhu Mountain Tunnel No.1 tunnel roof lifting construction as an example,adopts the"lateral shed hole method"construction,and expounds the roof lifting construction scheme of inclined shaft intersection.The technical principle of the construction method is simple,and the operation is strong,which can provide experience reference and technical guidance for similar tunnel roof lifting construction.

关 键 词:隧道 正洞挑顶 横向棚洞法 

分 类 号:TU994[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象