检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:叶观宝[1,2] 田佳乐 史玉金[3] 许言[3] 张振[1,2] 黄弋烓 YE Guan-bao;TIAN Jia-le;SHI Yu-jin;XU Yan;ZHANG Zhen;HUANG Yi-wei(Department of Geotechnical Engineering College of Civil Engineering,Tongji University,Shanghai 200092,China;Key Laboratory of Geotechnical and Underground Engineering of the Ministry of Education,Shanghai 200092,China;Shanghai Institute of Geological Survey,Shanghai 200072,China)
机构地区:[1]同济大学土木工程学院地下建筑与工程系,上海200092 [2]同济大学岩土及地下工程教育部重点实验室,上海200092 [3]上海市地质调查研究院,上海200072
出 处:《地基处理》2024年第S01期67-74,共8页Journal of Ground Improvement
摘 要:已有研究表明,高层建筑从下部至上部的结构施工阶段,以及竣工后运营阶段,都会对邻近的地铁隧道产生影响。然而,目前国内关于高层建筑对邻近隧道影响的研究主要关注下部结构施工阶段,对上部结构施工阶段的研究成果较少。因此,本文针对城市化进程中高层建筑施工对邻近软土隧道影响的问题展开研究,以上海市某高层商办楼项目为案例,采用Plaxis 3D软件建立三维有限元数值模型,通过现场监测数据验证模型准确性后,分析了坑隧水平间距、坑隧垂直间距和基坑深度对隧道结构内力和变形的影响。研究发现,隧道的最大位移、轨道高差、上下行线差异沉降均会随着坑隧水平间距与隧道中心埋深的增加而减小,随基坑开挖深度的增加变化不明显,3个影响因素对隧道最大弯矩的影响均不明显;此外,3个影响因素对隧道沉降的影响程度相近,但坑隧水平间距为主要影响因素。Existing research indicates that the construction phase of high-rise buildings,from the lower to the upper,as well as the operational phase,impacts adjacent subway tunnels.However,current domestic studies mainly focus on the lower structure construction stage,with fewer results addressing the upper structure construction stage.Aiming at the influence of high-rise building construction on adjacent soft soil tunnels in the process of urbanisation,a high-rise commercial office building project in Shanghai is taken as a case study,and a three-dimensional finite element numerical model is established by using Plaxis 3D.After verifying the model accuracy with on-site monitoring data,the influence of horizontal distance and vertical distance between pit and tunnel,depth of the pit on the internal force and deformation of the tunnel structure are analysed.It is found that the maximum displacement of the tunnel,the height difference of the track,and the differential settlement of the up and down lines will all decrease with the increase of the horizontal distance between pit and tunnel and the buried depth of the tunnel center.The change is not significant with the increase of the excavation depth of the pit,and the influence of the three influencing factors on the maximum bending moment of the tunnel is not significant.In addition,the three influencing factors have similar degrees of influence on tunnel settlement,but the horizontal distance between pit and tunnel is the main influencing factor.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.248