重载交通下分车道管理老路路面改造方案研究  

Research on the Reconstruction Scheme of the Old Road with Divided Lane Management under Heavy Load Traffic

在线阅读下载全文

作  者:李林 程全 LI Lin;CHENG Quan(Shenzhen Transportation Public Facilities Construction Center,Shenzhen 518040,China;CCCC Second Highway Consultants Co.Ltd.,Wuhan 430056,China)

机构地区:[1]深圳市交通公用设施建设中心,深圳市518040 [2]中交第二公路勘察设计研究院有限公司,武汉市430056

出  处:《公路》2024年第7期338-342,共5页Highway

摘  要:以G30连霍高速公路哈密至吐峪沟段改扩建工程为例,通过不同分车道管理后的服务水平和车道数需求进行比较,拟定分车道管理的运营方案,进而明确不同车道的车型分配和轴载作用次数,达到充分利用既有老路的剩余使用寿命目的,避免路面的过度利用或改造不彻底情况。Taking the reconstruction and expansion project from Hami to Tuyugou section of G30 Lianyungang-Khorgos Expressway as an example,by comparing the service level and lane number demand after different lane division management,the operation plan of lane division management is drawn up,and then the model distribution and the number of axle load functions of different lanes are clarified,so as to make full'use of the remaining life of the existing old road to avoid excessive or incomplete transformation of the road surface.

关 键 词:老路路面改造 货车比例大 服务水平 车道数 

分 类 号:U418.8[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象