检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张煜[1,2,3] 唐可心 徐亚军 计三有[1] ZHANG Yu;TANG Kexin;XU Yajun;JI Sanyou(School of Transportation and Logistics Engineering,Wuhan University of Technology,Wuhan 430063,China;Engineering Research Center of Port Logistics Technology and Equipment,Ministry of Education,Wuhan University of Technology,Wuhan 430063,China;Shaoguan Research Institute of Wuhan University of Technology,Shaoguan 512100,China)
机构地区:[1]武汉理工大学交通与物流工程学院,湖北武汉430063 [2]武汉理工大学港口物流技术与装备教育部工程研究中心,湖北武汉430063 [3]武汉理工大学韶关研究院,广东韶关512100
出 处:《计算机集成制造系统》2024年第7期2608-2620,共13页Computer Integrated Manufacturing Systems
基 金:国家自然科学基金资助项目(72174160)。
摘 要:针对自动化集装箱码头中岸桥与人工智能运输机器人(ART)的集成调度问题,依据作业阶段将设备能耗划分成多个表现形式,构建以最小化岸桥和ART的总能耗为目标的整数规划模型。为提高求解质量,提出一种具有重组变异和随机扰动的自适应粒子群算法。根据不同时期的搜索需求,对惯性权重实行自适应调整;并引入随机粒子增强个体的交互能力,结合迭代进程对最优粒子实施不定维更新,为其摆脱局部困境提供更多机会。最后,以天津港北疆C段自动化集装箱码头为研究背景设计了不同规模算例,将改进算法与GUROBI求解器以及其他算法进行比较,验证了模型和算法的有效性。结果表明,随着岸桥和ART的配置数量逐渐增加,作业进程加快,码头总能耗分别呈现降低和先降后升的趋势;此外,相比于传统的调度模型,所提方法能够在较短的完工时间里节约更多的作业能耗。Aiming at the integrated scheduling problem of quay crane and Artificial Intelligence Robot of Transportation(ART)in automated container terminal,the energy consumption were divided into multiple forms according to the different operation states of the equipment.An integrated scheduling model was established,which took the minimum energy consumption of quay crane and ART as optimization target.To improve the solution quality,an adaptive particles swarm optimization with recombination variation and random disturbance was proposed.According to the search requirements in different stages,the inertia weight was adjusted adaptively.In addition,the random particles were introduced to enhance the interaction ability of individuals.Combined with the iterative process,some dimensions of the optimal particle were updated indefinitely,which provided more opportunities for getting rid of local difficulties.Taking the automated container terminal in section C of Tianjin Beijiang as the research background,the numerical experiments with instances of different sizes were conducted to compare improved algorithm with the GROBI solver and other algorithms,and the effectiveness of the proposed model and algorithm were verified.The results showed that the operation process was accelerated with the gradual increase of the number of quay crane and ART,and the total energy consumption of the terminal was decreased and then increased respectively.Compared with the traditional scheduling model,the proposed method could save more energy consumption in shorter completion time.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7