曲线盾构隧道施工期地表位移计算方法及影响因素分析  

Calculation method and influencing factors of surface displacement during construction of curved shield tunnel

在线阅读下载全文

作  者:杨果林[1] 杨一凡 徐浩栋 罗桂军 肖洪波 YANG Guo-lin;YANG Yi-fan;XU Hao-dong;LUO Gui-jun;XIAO Hong-bo(School of Civil Engineering,Central South University,Changsha 410075,China;Civil Engineering Co.Ltd.of China Construction Fifth Engineering Bureau,Changsha 410041,China)

机构地区:[1]中南大学土木工程学院,长沙410075 [2]中建五局土木工程有限公司,长沙410041

出  处:《吉林大学学报(工学版)》2024年第7期1997-2008,共12页Journal of Jilin University:Engineering and Technology Edition

基  金:国家自然科学基金项目(51478484,51778641).

摘  要:为了分析曲线盾构隧道施工期地表位移变化规律及影响因素,建立了考虑盾构主动铰接机构的曲线隧道开挖力学模型,分别提出了盾构施工附加应力和地层损失所引起的地表位移计算方法。基于实际工程,开展了相应监测试验和数值模拟,研究了影响地表位移偏移的敏感度指标。结果表明:曲线段地表位移沿隧道开挖方向向隧道内侧偏移,计算方法所得曲线段地表最大位移值和偏移值与实测值基本一致;敏感度分析发现,不平衡系数的敏感度最高,而在曲线超挖间隙因素中转弯半径和开挖半径敏感较高。建议曲线段施工应合理控制内外侧油缸推力差和超挖范围。To analyze the variation law and influencing factors of surface displacement during the construction of curved shield tunnel.The mechanical model of curved shield tunnel excavation considering active articulated mechanism is established,and the calculation methods of surface displacement caused by additional stress and ground loss based on mirror method and orifice expansion theory are deduced respectively.Based on the actual project,the corresponding monitoring test and numerical simulation are carried out,the sensitivity index affecting the surface displacement offset of curved shield was researched.The results show that:The surface displacement of the curved section is offset to the inside of the tunnel in the direction of tunnel excavation,and the maximum displacement value and offset value of the curved section obtained by the calculation method are basically consistent with the measured values.It is found that the sensitivity of the imbalance coefficient is the highest,while the turning radius and excavation radius are sensitive in the curve over-digging gap factor.It is recommended that the thrust difference and overexcavation range of the inner and outer cylinders should be reasonably controlled in the construction of the curve section.

关 键 词:盾构隧道 地表位移 计算方法 曲线超挖间隙 敏感度 

分 类 号:TU456.3[建筑科学—岩土工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象