检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杜云衍 DU Yunyan(China Gezhouba Second Engineering Co.,Ltd.,Chengdu 610091,China)
机构地区:[1]中国葛洲坝第二工程有限公司,四川成都610091
出 处:《技术与市场》2024年第8期105-109,共5页Technology and Market
摘 要:随着我国推进国家铁路系统布局,加快了对环境恶劣高海拔地区的铁路建设。路基施工作为铁路施工的重要环节,高海拔地区路基施工质量控制尤为重要,为解决高原高海拔地区铁路路基施工面临季节性冻土等施工难题,通过优化施工工艺和控制施工要点,提高高海拔地区铁路路基施工质量,为高海拔地区铁路路基施工提供经验。With the promotion of the layout of the national railway system in China,the construction of railways in high-altitude areas with harsh environment has been accelerated.As an important part of railway construction,the quality control of subgrade construction in high-altitude areas is very important.In order to solve the difficulties faced by the construction of railway subgrade in high-altitude areas such as seasonal frozen soil in high-altitude areas,the construction problems encountered in the actual construction process are analyzed and summarized by optimizing the construction technology and controlling the key points of construction,so as to improve the construction quality of railway subgrade in high-altitude areas and provide experience for the subsequent construction of railway subgrade in high-altitude areas.
分 类 号:U213.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49