检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴凡 徐立中 WU Fan;XU Lizhong(Qingdao Metro Operation Co.,Ltd.,Qingdao 266061,China)
出 处:《铁道勘察》2024年第4期125-131,共7页Railway Investigation and Surveying
摘 要:为研究轨道精测精调技术对地铁振动源强带来的影响,选取某运营期地铁线路典型地段作为试验段,在该试验段建立任意设站控制网并进行轨道几何状态绝对测量,测得线路相对于设计位置的绝对偏差值,并结合轨道几何状态相对测量数据制订轨道精调方案,以指导该试验段轨道精调作业。另外,选取试验段中的一个典型断面作为检测断面,检测该断面处轨道精测精调前后钢轨、道床及隧道壁的最大Z振级(VLzmax),以定量分析轨道精测精调技术对地铁振动源强带来的影响。研究表明,试验段轨道精调后,动态平均TQI从7.09降低至4.98,钢轨、道床及隧道壁的VLzmax分别下降3.62 dB、4.94 dB及1.52 dB。研究结果表明,轨道精测精调对轨道减振效果显著,可以有效降低地铁振动源强值。To study the effect of track precision measurement and adjustment technology on subway vibration source intensity,a quantitative analysis method was adopted to conduct vibration tests on the steel rails,track beds,and tunnel walls before and after track precision adjustment.A typical section of a subway line during a certain operating period was selected as the test section,and an arbitrary station control network was established in this test section.Based on this section's arbitrary station control network,the absolute deviation value of the line relative to the design position was measured by absolute measurement of the track geometry state.Combined with the relative measurement data of the track geometry state,a track precision adjustment plan was developed to guide the track precision adjustment operation of this test section.At the same time,a typical section in the experimental section was selected as the detection section to detect the maximum Z vibration level(VLzmax)of the steel rail,track bed,and tunnel wall before and after precision measurement and adjustment of the track at that section.By comparing the VLzmax of the steel rail,track bed,and tunnel wall before and after precision measurement and adjustment of the track,the effect of precision measurement and adjustment technology on subway vibration source intensity was quantitatively analyzed.The results obtained from the study includes:the dynamic average TQI of the experimental section decreases from 7.09 to 4.98 before and after precision adjustment of the track.Vibration tests conducted before and after precision adjustment of the track shows that the VLzmax of the rail,track bed,and tunnel wall decrease by 3.62 dB,4.94 dB,and 1.52 dB,respectively.The conclusion of this study is that the precise measurement and adjustment technology of the track has brought significant effects on track vibration reduction,which can effectively reduce the intensity value of subway vibration source.
关 键 词:地铁 任意设站 控制网 轨道精测 轨道精调 轨道平顺性 振动测试
分 类 号:U231[交通运输工程—道路与铁道工程] U213.2
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.164.48