检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张涛 ZHANG Tao
机构地区:[1]中海油深圳海洋工程技术服务有限公司,广东深圳518000
出 处:《中国修船》2024年第4期7-11,共5页China Shiprepair
摘 要:某工程船负荷大时会出现轴系跳动、艉轴管密封处漏油漏水现象。为解决该问题,文章在左、右艉轴管前部各加装一轴承。加装轴承过程中,将轴承座车削加工,用干冰冷冻方法将新制轴套镶嵌在轴承座内,解决了右艉轴管前部轴承座出现的偏心问题。加装后对轴系各轴承进行顶升法负荷测试,各轴承承载负荷分布合理。出厂海试及多次大负荷项目作业均没有出现轴系跳动及密封漏油漏水现象,本次加装轴承的工作合理有效。When an engineering ship is under heavy load,there is shafting runout and oil/water leakage at the seal of the stern tube.To solve these problems,this paper installs an extra bearing in front of each stern tube at the portside and starboard.During the installation of the bearings,this paper solved the eccentricity of the front bearing seat of the starboard stern tube by machining the bearing seat and embedding a new sleeve into it with the dry ice freezing method.After the installation,each bearing of the shafting with the jack-up method,showed that each bear⁃ing load was reasonably distributed.During the sea trial and many high-load projects,there were no shafting runouts or oil/water leakages,which fully demonstrated that the installation of extra bearings was reasonable and effective.
分 类 号:U672[交通运输工程—船舶及航道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7