马房特大桥主桥悬浇箱梁菱形挂篮施工工艺  

Construction Technology of Rhomboid Hanging Basket for Suspension Casting Box Girder of Majong Large Bridge

在线阅读下载全文

作  者:梁仕杰 LIANG Shijie(Zhaoqing Highway Development Co.,Ltd.,Zhaoqing,Guangdong 526000,China)

机构地区:[1]肇庆市公路发展有限公司,广东肇庆526000

出  处:《黑龙江交通科技》2024年第8期117-121,共5页Communications Science and Technology Heilongjiang

摘  要:为了研究大跨度预应力混凝土连续桥梁的施工技术,以马房特大桥主桥悬浇箱梁菱形挂篮施工为例,对菱形挂篮施工工艺进行了详细研究。通过使用自动化和半自动化钢筋加工设备,钢筋加工效率提高了30%;预制构件的使用使得施工周期缩短了15%;智能化施工技术的应用,使施工误差减少了20%。这些创新措施不仅提高了施工效率和质量,还显著降低了安全风险。In order to study the construction technology of the long-span prestressed concrete continuous bridge,the construction technology of the diamond hanging basket is studied in detail.Through the use of automatic and semi-automatic steel processing equipment,the steel processing efficiency is increased by 30%;the use of prefabricated components shortens the construction cycle by 15%;the application of intelligent construction technology reduces the construction error by 20%.These innovative measures not only improve the construction efficiency and quality,but also significantly reduce the safety risks.

关 键 词:特大桥 悬浇箱梁 菱形挂篮 

分 类 号:U445.57[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象