基于AHP的现代有轨电车后评价体系  

Post-evaluation System of Modern Tram Based on AHP

在线阅读下载全文

作  者:王敏 WANG Min(School of Civil Engineering,Southeast University,Nanjing 211189,China;JSTI Group Co.,Ltd.,Nanjing 210019,China)

机构地区:[1]东南大学土木工程学院,南京211189 [2]苏交科集团股份有限公司,南京210019

出  处:《现代交通技术》2024年第4期74-78,共5页Modern Transportation Technology

摘  要:现代有轨电车已在多个城市开通运营,建立有轨电车后评价体系的必要性逐渐凸显。以南京河西新城有轨电车为例,首先利用层次分析法(analytic hierarchy process,AHP)建立有轨电车后评价模型,其次基于模型从规划功能、客流效益、运营管理和交通影响四个方面提出后评价体系,对河西新城有轨电车规划、建设、运营及维护提出合理的改善建议,同时也为类似后评价项目提供参考。The modern tram has been in operation in many cities of our country,and the necessity of establishing the postevaluation system of tram is becoming more and more obvious.Taking the tram of Hexi New Town in Nanjing as an example,firstly,the analytic hierarchy process(AHP)is used to construct the model for post-evaluation,secondly,the post evaluation system is proposed from four aspects of planning functions,passenger flow benefit,operation management and traffic impact based on the model,so as to put forward reasonable suggestions for the tram planning,construction,operation and maintenance in Hexi New Town,and also provide reference for the subsequent similar projects in the future.

关 键 词:有轨电车 层次分析法 后评价体系 

分 类 号:U482.1[交通运输工程—载运工具运用工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象