检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:仝洋
出 处:《科技创新与应用》2024年第28期149-152,共4页Technology Innovation and Application
摘 要:大型工程施工的设备选型及布置对工程的安全高效运转具有重要作用。该文以某特大跨河大桥主桥桥塔施工为例,从施工工艺及重点工程角度,对施工中所需吊装起重机、施工电梯、液压爬模等重要设备的选型及安装布置进行探讨。该文旨在为类似工程施工的优化设计提供参考。Equipment selection and layout for large-scale project construction play an important role in the safe and efficient operation of the project.Taking the construction of the main bridge tower of a very large river-crossing bridge as an example,this paper discusses the selection and installation layout of important equipment such as hoisting cranes,construction elevators,and hydraulic climbing formworks required during construction from the perspective of construction technology and key projects.This paper aims to provide reference for the optimization design of similar projects.
分 类 号:U445.3[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.185