建筑地基项目施工中真空降水联合强夯处理工艺的运用  

Application of Vacuum Precipitation Combined with Dynamic Compaction in the Construction of Building Foundation Project

在线阅读下载全文

作  者:何刚 Gang He(Beijing Urban Construction North Group Co.,Ltd.,Beijing,100000,China)

机构地区:[1]北京城建北方集团有限公司,北京100000

出  处:《工程设计与施工》2024年第4期31-33,共3页Engineering Design and Construction

摘  要:在建筑地基项目施工作业中,真空降水联合强夯处理工艺是把真空降水与强夯法这两种技术相融合的一种复合型地基处理技术,可为沿海地区的软弱地基施工作业提供工作思路。基于此,论文主要以建筑地基项目施工为背景,对真空降水联合强夯处理工艺的实际使用情况进行了剖析,重点对是本工艺的应用原理、原则以及具体的工艺是个要点进行了详细分析。经过研究可以看出,使用真空降水联合强夯处理工艺能提升地基的整体承载力、减少土体的综合含水量。In the construction operation of building foundation project,vacuum precipitation combined with dynamic compaction treatment process is a composite foundation treatment technology that integrates vacuum precipitation and dynamic compaction method,which can provide working ideas for the construction operation of weak foundation in coastal areas.Based on this,this paper mainly takes the construction of building foundation project as the background,analyzes the actual use of vacuum precipitation combined with dynamic compaction treatment process,and mainly analyzes the application principle,principle and specific process in detail.It can be seen that the use of vacuum precipitation combined with dynamic compaction treatment process can improve the overall bearing capacity of the foundation and reduce the comprehensive water content of the soil.

关 键 词:建筑地基 项目施工 真空降水 强夯处理 运用方式 

分 类 号:TU7[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象