作 者:李文乾 黄高亮[2] 朱潇昂 刘明洪 陈俞超 胡安峰[3] Li Wenqian;Huang Gaoliang;Zhu Xiaoang;Liu Minghong;Chen Yuchao;Hu Anfeng(China Railway Tenth Bureau Group Urban Rail Transit Engineering Co.,Ltd.,Guangzhou 510000,Guangdong,China;Hangzhou Construction Project Quality and Safety Supervision Station,Hangzhou 310005,Zhejiang,China;Research Center of Coastal and Urban Geotechnical Engineering,Zhejiang University,Hangzhou 310030,Zhejiang,China)
机构地区:[1]中铁十局集团城市轨道交通工程有限公司,广东广州510000 [2]杭州市建设工程质量安全监督总站,浙江杭州310005 [3]浙江大学滨海和城市岩土工程研究中心,浙江杭州310030
出 处:《岩土工程技术》2024年第5期560-565,共6页Geotechnical Engineering Technique
基 金:国家自然科学基金项目(51978612)。
摘 要:针对某新建盾构隧道近接上跨既有地铁项目,基于小应变硬化模型(HSS),建立了三维有限元模型,通过与实测数据和莫尔–库伦模型计算结果的对比,验证了HSS模型计算的可靠性和优越性。在此基础上,进一步分析了新建隧道施工引起的既有隧道竖向变形特征,及隧道水平净距和叠交角度两参数对既有隧道变形的影响规律。结果表明:HSS模型计算结果与实测值吻合较好,能有效预测既有地铁隧道的变形;在新建隧道上跨穿越的影响下,既有地铁隧道产生竖向隆起变形,且变形主要发生在盾构下穿前的1.5倍新建隧道直径到穿越后的2倍新建隧道直径范围内;既有地铁隧道隆起峰值点会随着盾构二次穿越而发生偏移,且其竖向变形曲线呈现出“双峰”趋势;增大双线隧道水平净距和新旧隧道叠交角度,都能使既有隧道的变形减小。A three-dimensional finite element model was established based on the HSS constitutive model for a newly constructed shield tunnel adjacent to an existing subway project.The correctness of the numerical calculation was verified by comparing it with measured data.On this basis,further analysis was conducted on the vertical deformation characteristics of existing tunnels caused by the construction of new tunnels,as well as the influence of the two parameters of tunnel horizontal clearance and overlap angle on the deformation of existing tunnels.The results show that the calculated results of HSS model are in good agreement with the measured values,and can effectively predict the deformation of existing subway tunnel.Under the influence of the new tunnel overpassing,the existing subway tunnel has vertical uplift deformation,and the deformation mainly occurs in the range of 1.5 times the diameter of the new tunnel before the shield tunneling under-crossing to 2 times the diameter of the new tunnel after the crossing.The uplift peak point of the existing subway tunnel will shift with the second crossing of the shield,and its vertical deformation curve shows a"double peak"trend.Increasing the horizontal clearance of double track tunnels and the overlapping angle of new and old tunnels can reduce the deformation of existing tunnels.
关 键 词:盾构隧道 上跨穿越 隧道竖向位移 数值计算 HSS本构模型
分 类 号:U455[建筑科学—桥梁与隧道工程]