地铁盾构施工下穿既有铁路桥梁影响性分析  

Analysis of the Impact of Subway Shield Construction Underpass Existing Railway Bridges

在线阅读下载全文

作  者:郭金英[1] GUO Jin-ying(Sichuan Vocational and Technical College of Communications,Chengdu 611130,China)

机构地区:[1]四川交通职业技术学院,成都611130

出  处:《价值工程》2024年第29期117-120,共4页Value Engineering

摘  要:依托某城市5号线和8号线的盾构隧道下穿既有铁路特大桥的工程项目,本研究结合盾构隧道施工对既有桥梁影响的理论,运用有限元模拟软件进行了详细分析。重点探讨了先后左右线盾构隧道施工对既有铁路特大桥的承台、立柱、桥面以及桩基的变形和受力变化。模拟结果显示,盾构施工过程中对既有铁路特大桥的变形和受力变化影响较小,均符合相关规范要求,盾构隧道施工不会对铁路的安全运营产生明显影响。Based on the engineering project of shield tunneling under the existing railway super large bridge of Line 5 and Line 8 in a certain city,this study combines the theory of the impact of shield tunneling construction on the existing bridge and uses finite element simulation software for detailed analysis.The focus was on exploring the deformation and stress changes of the bearing platform,columns,bridge deck,and pile foundation of the existing railway super large bridge caused by the construction of left and right shield tunnels.The simulation results show that the deformation and stress changes of the existing railway super large bridge are relatively small during the shield tunneling construction and meet the relevant regulatory requirements.Shield tunneling construction will not have a significant impact on the safe operation of the railway.

关 键 词:盾构隧道 下穿桥梁 数值模拟 影响分析 

分 类 号:U455.43[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象