检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭伟龙 Guo Weilong(Qinghai Guoluo Highway Engineering Construction Co.,Ltd.,Xining 810000,China)
机构地区:[1]青海省果洛公路工程建设有限公司,西宁810000
出 处:《青海交通科技》2024年第1期41-45,71,共6页Qinghai Transportation Science and Technology
摘 要:水系连通性是衡量湿地生态系统的结构和功能完整性的重要指标,对于维持湿地生态系统的稳定性具有重要意义。公路建设会影响湿地内物质与能量的交换以及生物的迁移,进而破坏湿地生态系统的稳定。本文系统阐述了公路建设中公路纵向、结构物形式及路基填筑方式等对水系连通性的影响,并总结了相应的保障措施,以维持湿地生态系统的稳定。Water system connectivity is an essential index to measure the structural and functional integrity of wetland ecosystems,and it is of great significance for maintaining the stability of wetland ecosystems.Highway construction will affect the exchange of material and energy in the wetland and the migration of organisms,thus destroying the stability of the wetland ecosystem.This Review systematically expounds on the influence of longitudinal highways,structural form,and subgrade filling methods on water system connectivity in highway construction.It summarizes forward corresponding guarantee measures to maintain the stability of the wetland ecosystem.
关 键 词:湿地 水系连通性 生态敏感性 公路纵向 结构物形式 路基填筑方式
分 类 号:U415[交通运输工程—道路与铁道工程] X171.1[环境科学与工程—环境科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28