检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:关涛[1] 肖一峰 任炳昱[1] 于浩[1] GUAN Tao;XIAO Yifeng;REN Bingyu;YU Hao(State Key Laboratory of Hydraulic Engineering Intelligent Construction and Operation,Tianjin University,Tianjin 300072,China)
机构地区:[1]天津大学水利工程智能建设与运维全国重点实验室,天津300072
出 处:《水力发电学报》2024年第10期85-96,共12页Journal of Hydroelectric Engineering
基 金:国家自然科学基金(52379131,52222907)。
摘 要:众多高拱坝施工面临着恶劣寒冷气候的考验。然而,现有的高拱坝施工过程仿真方法较少直接考虑气温对施工的影响,且未考虑基于气温预测成果进行动态分块,以分析寒冷条件下利用正温时段进行浇筑的特点。针对以上问题,本文提出了基于Informer的寒冷条件下高拱坝施工过程仿真方法。首先,提出基于Informer气温预测模型,实现未来气温序列的预测,在此基础上实现可施工时段分析;其次,建立考虑动态分块的寒冷条件下高拱坝施工进度仿真模型,提出更加贴近实际施工情况的分块施工仿真策略,以更好地模拟和分析不同气温条件下的施工过程;最后,以西南地区的叶巴滩高拱坝工程为例进行研究,采用Informer模型对气温进行预测,平均误差为±1.49℃,每日的可施工时长平均误差为±1.16 h。通过对比三种不同的仿真策略,发现寒冷条件下采用动态分块策略可以充分利用可浇筑时段,施工效率更高,也表明在仿真中“考虑气温”比简单降效处理更加贴近实际情况。Construction of many high arch dams is faced with harsh cold weather conditions.However,few previous methods for the simulation directly consider the impact of temperature on construction or the dynamic warehousing based on temperature predictions for utilizing fully the unfreezing temperature period for concrete pouring in the cold season.This paper presents a new method for simulating the construction process of high arch dams under cold conditions based on Informer.First,we establish a temperature prediction model based on Informer to predict future temperature sequences,and apply it to construction analysis.Then,we develop a dynamic partition construction model for constructing a high arch dam under cold conditions,and implement a partition construction simulation strategy applicable in real construction environment,so as to improve the construction simulation and analysis for different temperature conditions.Finally,the Informer model is used to predict temperature in a case study of the Yebatan high arch dam project located in the southwest region,generating an average error of±1.49℃and a daily average error of±1.16 hours of construction time.We compare three different simulation strategies and verify that the dynamic partition strategy is more efficient under cold conditions,demonstrating temperature factor consideration gives improved simulations that are closer to reality than the method of simply reducing efficiency.
关 键 词:寒冷条件 高拱坝 INFORMER 气温预测 动态分块
分 类 号:TV511[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.23.61.129