检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张翌娜[1] 李紫瑜 张建伟 黄锦林[3] ZHANG Yi-na;LI Zi-yu;ZHANG Jian-wei;HUANG Jin-lin(Yellow River Conservancy Technical Institute,Kaifeng 475004,China;School of Water Conservancy,North China University of Water Resources and Electric Power,Zhengzhou 450046,China;Guangdong Research Institute of Water Resources and Hydropower,Guangzhou 510610,China)
机构地区:[1]黄河水利职业技术学院,河南开封475004 [2]华北水利水电大学水利学院,河南郑州450046 [3]广东省水利水电科学研究院,广东广州510610
出 处:《水电能源科学》2024年第10期140-143,157,共5页Water Resources and Power
基 金:国家自然科学基金项目(52279133);广东省水利科技创新项目(2020-18)。
摘 要:随着远距离、高流量、大跨度渡槽工程的不断发展,渡槽运行状态监测与评价日益重要。以广东省罗定市长岗坡渡槽工程为例,基于渡槽泄流振动位移数据,提出一种基于排列熵算法(PE)和隐马尔可夫模型(HMM)的渡槽运行状态评价方法。首先,运用排列熵算法和K-means法提取振动位移数据基本特征,形成HMM模型的观测状态序列。其次,运用HMM算法训练模型参数,以平均误差百分比为指标,筛选出最佳模型参数,并以该参数为初值再次训练得到渡槽运行期隐状态的概率分布。最后,结合渡槽运行期隐状态对应的分值等级及概率值,求得渡槽运行状态期望值,从而量化评价渡槽运行状态。结果表明,基于PE-HMM法的渡槽运行状态评价结果与实地勘察结论一致,可见PE-HMM法能够从渡槽振动位移数据角度出发,真实反映渡槽结构运行状态,具有较高的评判精度与工程指导意义。With the continuous development of long-distance,high-flow,and large-span aqueduct projects,the monitoring and evaluation of the aqueduct's operating status has become increasingly important.The Changgangpo aqueduct project in Luoding City,Guangdong Province is used as the project for the study.Based on the discharge vibration displacement data of the aqueduct,a method based on Permutation Entropy(PE)and Hidden Markov Model(HMM)for evaluation of aqueduct operation damage state was proposed.Firstly,the Permutation Entropy algorithm and the K-means method were adopted to extract the basic features of the vibration data for generating the observed state sequences of the HMM model.Secondly,the model parameters were trained using the HMM algorithm,and the mean absolute percentage error was used as a metric to filter the best model parameters.These parameters as the initial values were used to retrain to obtain the probability distribution of the hidden state during the operation of the aqueduct.Finally,combining the score level and probability value corresponding to the hidden state of the aqueduct during the operation period,the desired value of the operational status of the aqueduct was obtained to quantitatively assess the operational status of the aqueduct.The evaluation results of aqueduct operation state based on PE-HMM method are consistent with the results of field investigation.It can be seen that the PE-HMM method can truly reflect the running state of aqueduct structure from the perspective of aqueduct vibration displacement data,and has high evaluation accuracy and engineering guiding significance.
分 类 号:TV672.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7