检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张磊[1,2] 林红星 刘建波[1,3] 孙婉静 ZHANG Lei;LIN Hongxing;LIU Jianbo;SUN Wanjing(CCCC Second Harbor Engineering Co.,Ltd.,Wuhan 430040,China;Key Laboratory of Large-span Bridge Construction Technology,Wuhan 430040,China;Research and Development Center of Transport Industry of Intelligent Manufacturing Technologies of Transport Infrastructure,Wuhan 430040,China;CCCC Highway Bridge National Engineering Research Centre Co.,Ltd.,Beijing 100120,China)
机构地区:[1]中交第二航务工程局有限公司,湖北武汉430040 [2]长大桥梁建设施工技术交通行业重点实验室,湖北武汉430040 [3]交通运输行业交通基础设施智能制造技术研发中心,湖北武汉430040 [4]中交公路长大桥建设国家工程研究中心有限公司,北京100120
出 处:《水运工程》2024年第11期202-208,共7页Port & Waterway Engineering
基 金:山东省重点研发计划项目(2021ZLGX04)。
摘 要:为了解决海上地连墙建设中,海上施工平台结构施工周期长、造价高等难题,利用锁扣钢管桩与工字形板桩组合围堰进行海中筑岛,围堰外侧设置平行钢丝索进行柔性约束,形成海中“锁扣钢管桩+工字形板桩+平行钢丝索”的柔性组合围堰结构。以传统刚性围箍和无围箍组合围堰结构作为对照,根据现场监测数据,对柔性组合围堰结构受力与变形特性进行分析。结果表明:与常规刚性围箍结构相比,在同样吹填土压力荷载作用下,柔性围箍结构中桩身最大弯矩减小约50%;无围箍结构中桩顶最大水平位移过大;在不均匀堆载作用下,刚性围箍自身应力会发生突变,而柔性围箍始终受拉,应力均匀分布。监测结果表明,柔性组合围堰结构实测应力、变形与计算一致性良好。The construction of offshore platform structure has long period and high cost in the construction of diaphragm wall in sea.To solve the problem,the combined cofferdam of locking steel pipe pile and I-shaped sheet pile is used to built islands in the sea,and the parallel steel wire cable is set outside the cofferdam for flexible restraint,forming a flexible composite cofferdam structure of“lock steel pipe pile+I-shaped sheet pile+parallel steel wire cable”in the sea.Compared with traditional rigid hoop and the non-hoop composite cofferdam structure,based on field monitoring data,stress and deformation characteristics of the proposed flexible hoop composite cofferdam structure are analyzed.The results show that compared with the conventional rigid hoop structure,the maximum bending moment of the pile in the flexible hoop structure is reduced by about 50%under the same dredger fill pressure load.The maximum horizontal displacement of the pile top is too large without the hoop structure.Under the action of uneven loading,the stress of the rigid hoop will change abruptly,while the flexible hoop is always tensioned and the stress is evenly distributed.The monitoring results show that the measured stress and deformation of the flexible composite cofferdam structure are in good agreement with the calculation.
关 键 词:柔性组合围堰 数值分析 海中筑岛 平行钢丝索 现场监测
分 类 号:U445[建筑科学—桥梁与隧道工程] U65[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15