检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谢长鹏 苏宇 李游 李懿 陈文波 XIE Changpeng;SU Yu;LI You;LI Yi;CHEN Wenbo(Xiluodu Hydropower Plant,China Yangtze Power Co.,Ltd.,Zhaotong 657300,China)
机构地区:[1]中国长江电力股份有限公司溪洛渡水力发电厂,云南昭通657300
出 处:《水电与新能源》2024年第11期18-21,共4页Hydropower and New Energy
摘 要:集水井来水量是防止水淹厂房的重要监测指标,目前多采用历史数据进行预估计算。为了提高集水井来水量计算的精度和效率,提出了一种适用于不同集水井的来水量动态计算方法,实现了集水井来水量的实时测算。计算结果表明,该方法误差在10%以内,可应用于水电站集水井来水量实时计算。The water inflow of collecting wells is an important monitoring indicator to prevent flooding of powerhouses in hydropower plants.Currently,it is often estimated with historical data.To improve the accuracy and efficiency of the water inflow calculation for collecting wells,a water inflow dynamic calculation method suitable for different collecting wells is proposed,which realizes a real-time calculation of the water inflow.The calculation results show that the error of the proposed method is within 10%.The method can be applied in real-time calculation of the water inflow of collecting wells in hydropower stations.
分 类 号:TV698[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.237.222