检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:卢钦武 陈智威 关振长[2] 蔡建国[3] 杨志伟 LU Qin-wu;CHEN Zhi-wei;GUAN Zhen-chang;CAI Jian-guo;YANG Zhi-wei(Fujian Expressway Science and Technology Innovation Research Institute Co.Ltd.,Fuzhou,Fujian 350001,China;College of Civil Engineering,Fuzhou University,Fuzhou,Fujian 350116,China;School of Civil Engineering,Southeast University,Nanjing,Jiangsu 211189,China)
机构地区:[1]福建省高速公路科技创新研究院有限公司,福建福州350001 [2]福州大学土木工程学院,福建福州350116 [3]东南大学土木工程学院,江苏南京211189
出 处:《岩土力学》2024年第11期3315-3323,共9页Rock and Soil Mechanics
基 金:国家自然科学基金项目(No.52278399);福建省自然科学基金(No.2021J01599)。
摘 要:以典型4车道公路隧道为原型,开展缩尺模型的静力推覆试验,重点关注地层位移、地层裂缝、围岩压力随推覆位移的发展规律,并与2车道隧道的试验结果展开对比。试验结果表明:(1)地层以起拱线为界发生相反方向位移进而产生裂缝,因此计算模型中起裂点位置应由边墙底部修正为起拱线处。(2)地层在推覆作用下沿隧道环向平顺滑移且大角度偏转倾斜,因此计算模型中潜在滑移面应由恒定竖直修正为线性倾斜。在此基础上,探讨了围岩压力计算模型假定在4车道隧道中的适用性,提出适用于4车道公路隧道的围岩压力修正计算模型。研究成果可为4车道公路隧道的抗震计算/验算提供试验依据与技术支撑,为围岩压力计算模型的进一步完善提供参考。Using a typical four-lane highway tunnel as a prototype,we conducted static pushover tests on a scaled-down model to examine the variations in ground displacement,ground pressure,and ground cracking with pushover distance.Compared with the test results of two-lane tunnel,the test results indicate that the ground is displaced reversely from the arching line and then cracked.Therefore,the location of fracture point should be modified from the bottom of the side wall to the arching line.The test results also show that the ground slides smoothly along the tunnel circumferential direction with a large inclination angle,so the potential slip planes should be modified from constant vertical to linear inclination.According to these test results,the applicability of surrounding ground pressure calculation model assumption in the four-lane tunnel is discussed,and a modified ground pressure calculation model suitable for the four-lane highway tunnels is proposed.These researches can provide experimental basis and technical support for the seismic calculation/checking of the four-lane highway tunnel,and provide reference for further improvement of surrounding ground pressure calculation model.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.87.133