检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:叶正联 刘立永 周武 周学彬 王锋 刘钦文 YE Zhengian;LIU Liyong;ZHOU Wu;ZHOU Xuebin;WANG Feng;LIU Qinwen(China Railway No.4 Engineering Group Co.,Ltd.,Hefei Anhui 230023,China;Shenzhen Municipal Engineering Quality and Safety Supervision Station,Shenzhen Guangdong 518034,China;China Railway South Investment Group Co.,Ltd.,Shenzhen Guangdong 518052,China;Shenzhen Metro Construction Group Limited Company,Shenzhen Guangdong 518026,China)
机构地区:[1]中铁四局集团有限公司,安徽合肥230023 [2]深圳市市政工程质量安全监督总站,广东深圳518034 [3]中铁南方投资集团有限公司,广东深圳518052 [4]深圳地铁建设集团有限公司,广东深圳518026
出 处:《现代城市轨道交通》2024年第12期97-102,共6页Modern Urban Transit
摘 要:文章以深圳地铁8号线三期工程小梅沙站至溪涌站工程为依托,通过数值模拟计算,研究有无减振孔对建筑物振速的影响,并分析不同减振孔设计参数下该工程减振孔的减振规律。结果表明:减振孔可以有效降低爆破振速峰值,使振动能量分布均匀,避免振动的集中和局部增强;减振孔的孔距增大时,减振孔的布置空间减少,减振效果降低;减振孔的孔径增大时,建筑物振速峰值减小,减振效果提高;减振孔的孔深增大时,减振效果提高,但当达到一定深度后,减振效果发生减弱。相关研究可为未来其他复杂地质条件下地铁基坑工程中的爆破振动控制提供参考和借鉴。Based on the project of Shenzhen metro line 8 phase III from Xiaomeisha station to Xichong station,numerical simulation calculations were conducted to study the impact of the presence or absence of vibration reduction holes on the vibration velocity of buildings,and to analyze the vibration reduction principles of the project's vibration reduction holes under different design parameters of vibration reduction holes.The results show that vibration reduction holes can effectively reduce the peak value of blasting vibration velocity,distribute vibration energy evenly,and avoid concentration and local enhancement of vibration;when the spacing of the vibration reduction holes increases,the layout space of the vibration reduction holes decreases,and the vibration reduction effect decreases;when the aperture of the vibration reduction hole increases,the peak vibration velocity of the building decreases and the vibration reduction effect improves;when the depth of the vibration reduction hole increases,the vibration reduction effect increases,but when a certain depth is reached,the vibration reduction effect weakens.The relevant research can provide reference and inspiration for future blasting vibration control in metro foundation pit projects under other complex geological conditions.
关 键 词:地铁 基坑爆破 振速 数值模拟 减振孔 减振效果
分 类 号:U455.6[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.25.60