检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:崔怀明[1] 蔡志云[1] Cui Huaiming;Cai Zhiyun(Science and Technology on Reactor System Design Technology Laboratory,Nuclear Power Institute of China,Chengdu,610213,China)
机构地区:[1]中国核动力研究设计院核反应堆系统设计技术重点实验室,成都610213
出 处:《核动力工程》2024年第6期242-247,共6页Nuclear Power Engineering
摘 要:针对华龙一号(HPR1000)核电机组运行图在特定工况下区域狭窄等问题。本文从提高余热排出系统(RHR)接入压力、降低主泵的启泵压力下限、扩大稳压器波动管两端允许的温差、降低反应堆冷却剂的过冷度限值等方面入手,对运行图进行了优化分析和研究,提出了HPR1000核电机组运行图的优化方案,优化前后对比分析表明,优化后的运行图的允许运行范围更宽、运行效率提高且运行可靠性增强。Aiming at the narrow area of the operating diagram of HPR1000 nuclear power unit under specific conditions,this paper makes an optimization analysis and research on the operating diagram from the aspects of increasing the operating pressure of the residual heat removal(RHR)system,lowering the lower limit of the start-up pressure of reactor coolant pump,enlarging the allowable temperature difference between the two ends of the pressurizer surge line,and lowering the limit of the sub-cooling of the reactor coolant.And then,an optimized operating diagram for HPR1000 is proposed.The comparative analysis before and after optimization shows that the optimized operating diagram has a wider allowable operation range,improved operation efficiency and enhanced operation reliability.
关 键 词:华龙一号(HPR1000) 运行图 波动管温差 过冷度 余热排出系统(RHR)接入压力
分 类 号:TL382[核科学技术—核技术及应用]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.140.250.157