检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Alex Hall Ming Cai Brad Simser Jared Lindsay
机构地区:[1]Glencore Sudbury Integrated Nickel Operations,Sudbury,Canada [2]School of Engineering and Computer Science,Laurentian University,Sudbury,Canada
出 处:《Deep Resources Engineering》2024年第1期68-84,共17页深部资源工程(英文)
摘 要:This paper presents details of the early to mid-stage deterioration in the form of notch growth of two 3 m diameter bored raises that were excavated and slashed to 7.8 m to serve as an internal shaft(winze).In addition,the long-term deterioration of a series of ore/waste passes that were excavated with the bottom-up Alimak methodology is investigated.These excavations were completed at depths between 1200 and 1915 m below the surface in a hard rock mine in Sudbury,Ontario,Canada.The ability to see a cross-section of fracturing around the bored raises while slashing into them and observing the progressive growth of fractures was critical for understanding the factors leading to deterioration.The Alimak-driven ore/waste passes were in an advanced state of deterioration,which provided a late-stage notch growth profile that could be compared with the notch growth observed in the bored raises.The methods used to support and stabilize these excavations are detailed;in addition,methodologies to prevent some of the deterioration from occurring are also presented.The findings of this work are useful for understanding the mechanisms driving brittle rock failure in deep mining and subsequently for minimizing or preventing the deterioration from occurring.
关 键 词:Shaft RAISE Ore pass Waste pass NOTCHING SCOURING Ground support BLASTING
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.201