检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴智 翁明桤 刘承希 潘金山[2,3,4] 耿敬春 WU Zhi;WENG Mingqi;LIU Chengxi;PAN Jinshan;GENG Jingchun(Department of Transportation,China Railway Chengdu Railway Group Co.,Ltd.,Chengdu 610082,Sichuan,China;School of Transportation and Logistics,Southwest Jiaotong University,Chengdu 610031,Sichuan,China;National United Engineering Laboratory of Integrated and Intelligent Transportation,Southwest Jiaotong University,Chengdu 610031,Sichuan,China;National Engineering Laboratory of Integrated Transportation Big Data Application Technology,Southwest Jiaotong University,Chengdu 610031,Sichuan,China;Track and Station Yard Consultation Department,China Railway Economic and Planning Research Institute,Beijing 100844,China)
机构地区:[1]中国铁路成都局集团有限公司运输部,四川成都610082 [2]西南交通大学交通运输与物流学院,四川成都610031 [3]西南交通大学综合交通运输智能化国家地方联合工程实验室,四川成都610031 [4]西南交通大学综合交通大数据应用技术国家工程实验室,四川成都610031 [5]中国铁路经济规划研究院有限公司线路站场咨询部,北京100844
出 处:《铁道运输与经济》2025年第1期115-127,共13页Railway Transport and Economy
基 金:中国国家铁路集团有限公司科技研究开发计划课题(K2023X030)。
摘 要:随着城际铁路交通运输网日趋完善与客流量的日益增长,采用列车开行方案和运行图一体化编制可以充分发挥沿线及车站设备能力,提高列车运输计划编制的效率与质量。以旅客出行成本与列车开行成本最小、客流需求与列车匹配度最大为目标,构建一体化编制多目标优化模型,采用改进的免疫克隆算法进行求解。针对一体化模型求解困难的问题,构建列车交路优化模型确定各时段内的列车交路与各交路上的列车开行频率,构造一体化模型的初始解,提高算法的求解效率。以长株潭城际铁路为实例进行验证,结果表明:与原始运营方案相比,旅客出行总成本节约7.7%,铁路运营成本节约10.5%,列车总运行时间减少了0.6 h。在客流高峰时段内,长沙至株洲方向与长沙至湘潭方向列车发车间隔均在12 min内。实例分析验证了模型的科学性与合理性,为实现城际铁路运输组织的协同优化提供理论依据。With the improvement of the intercity railway transportation network and the growth of passenger flows,the integrated compilation of train operation plan and working diagram can give full play to the equipment capacity along the line and at the station and improve the efficiency and quality of train transportation plan compilation.In this paper,to minimize passenger travel cost and train operation cost and maximize passenger demand and train matching degree,a multiobjective optimization model for integrated compilation was constructed and solved by an improved immune cloning algorithm.In view of the difficulty in solving the integrated model,a train routing optimization model was constructed to determine the train routing in each period and the train operation frequency on each route,and the initial solution of the integrated model was obtained to improve the solving efficiency of the algorithm.By taking the Changsha-Zhuzhou-Xiangtan Intercity Railway as an example,the results show that compared with the original operation scheme,the total cost of passenger travel is saved by 7.7%,and the railway operation cost is saved by 10.5%.The total operation time of trains is reduced by 0.6 hours.During the peak hours of passenger flow,the departure interval of trains from Changsha to Zhuzhou and from Changsha to Xiangtan is within 12 min.The science and rationality of the model are verified,which provides a theoretical basis for realizing the cooperative optimization of intercity railway transportation organization.
关 键 词:城际铁路 列车开行方案 列车运行图 一体化编制 改进的免疫克隆算法
分 类 号:U292.41[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.23.60.252