检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张海 Zhang Hai(Zigong Light Industry Design&Research Institute Co.,Ltd.,Sichuan,Zigong,643000)
机构地区:[1]自贡市轻工业设计研究院有限责任公司,四川自贡643000
出 处:《中国井矿盐》2025年第1期42-43,共2页China Well and Rock Salt
摘 要:设计阶段的工程造价管理不仅关乎工程的安全性和功能满足,还直接影响经济效益。本文分析了工程设计管理在项目执行中负责监督设计过程和成果,确保设计质量、进度和投资控制,以避免因设计选择的不经济性导致的资源浪费。Project cost management in the design stage is not only related to the safety and functional satisfaction of the project,but also directly affects the economic benefits.This paper analyzes that engineering design management is responsible for supervising the design process and results and ensuring design quality,schedule as well as investment control during project implementation,so as to avoid the waste of resources caused by uneconomical design selection.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49