检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:苗梦瑶 马刚[1,2,3] 艾志涛 程欣悦 汪家伟 周伟[1,2,3] MIAO Mengyao;MA Gang;AI Zhitao;CHENG Xinyue;WANG Jiawei;ZHOU Wei(State Key Laboratory of Water Resources Engineering and Management,Wuhan University,Wuhan 430072,China;Institute of Water Engineering Sciences,Wuhan University,Wuhan 430072,China;Key Laboratory of Rock Mechanics in Hydraulic Structural Engineering,Ministry of Education,Wuhan University,Wuhan 430072,China)
机构地区:[1]武汉大学水资源工程与调度全国重点实验室,武汉430072 [2]武汉大学水工程科学研究院,武汉430072 [3]武汉大学水工岩石力学教育部重点实验室,武汉430072
出 处:《水力发电学报》2025年第1期64-76,共13页Journal of Hydroelectric Engineering
基 金:国家自然科学基金项目(52322907,52179141);水电水利规划设计总院有限公司科技项目经费资助(ZYGN-KW2310-051)。
摘 要:随着堆石坝高度从200 m级向300 m级迈进,大坝变形协调控制变得尤为重要,基于参数反演的堆石坝有限元模拟是进行变形性态评估的常用手段之一。为探讨不同参数反演策略在高心墙堆石坝中的适用性,本文进行了参数联合反演与解耦反演策略对比研究。采用神经网络构建有限元正算的代理模型,采用群体智能优化算法进行迭代寻优,反演得到静力、流变和湿化模型参数。相较于人工干预少、效率高的参数联合反演方法,参数解耦反演方法通过分阶段、分区域的材料参数反演,能够更合理地反映填筑蓄水过程对堆石坝变形的影响。基于解耦反演参数计算的坝体变形与实测值吻合良好,更有效地揭示了坝体在填筑、蓄水及长期运行过程中的变形空间分布和演变规律。As rockfill dams advance in height from the 200-meter to 300-meter class,a coordinated control of dam deformation becomes particularly important,and their deformation behaviors are commonly assessed using parametric inversion-based finite element stress-deformation analysis.To investigate the applicability of different parametric inversion strategies to high-core-wall rockfill dams,this paper presents a comparative study of the two strategies-parametric joint inversion and decoupled inversion.We use the neural network to construct an agent model for the analysis by FEM,and adopt a population-intelligent iterative optimization algorithm to calculate the inversion of static,rheological,and humidification model parameters.Compared with the parameter joint inversion that features with less manual intervention and high efficiency,the decoupled inversion reflects more reasonably the influence of the filling and impounding process on rockfill dam deformation through a staged and zoned inverting procedure.It produces better model parameters and dam body deformation calculations in good agreement with measurements,thus achieving better effects in revealing deformation evolution and its spatial distribution trends in a dam body during filling,impounding and long-term operation.
关 键 词:高心墙堆石坝 监测数据 参数反演 智能优化算法 解耦反演
分 类 号:TV641.4[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49