检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:田大鑫 Tian Daxin(State Grid Shanxi Electric Power Company Lanxian Power Supply Company,Lvliang,Shanxi,China,033000)
机构地区:[1]国网山西省电力公司岚县供电公司,山西吕梁033000
出 处:《仪器仪表用户》2024年第10期95-97,100,共4页Instrumentation
摘 要:在电力技术快速发展的今天,人们对电力供应的稳定性、安全性以及持续性提出了全新的要求,并且在技术不断升级的同时,对应的带电作业也得到了较为广泛的应用。文中深入分析10 kV配网旁路带电作业更换变压器技术的应用效果和相关注意事项,同时结合更换变压器这一案例,能够更进一步说明带电作业法的技术应用理念,从而最大限度地确保城市电网的安全性、稳定性以及可靠性。With the rapid development of power technology today,people have put forward new requirements for the stability,safety,and continuity of power supply.Meanwhile,with the continuous upgrading of technology,corresponding live-line operations have also been widely applied.This article deeply analyzes the application effects and relevant considerations of the 10 kV distribution network live-line transformer replacement technology.Combined with a case study of transformer replacement,it further illustrates the technical application concepts of live-line operations,thus ensuring the safety,stability,and reliability of the urban power grid to the maximum extent.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49