检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵云 游诚曦 ZHAO Yun;YOU Chengxi
机构地区:[1]中国铁路广州局集团有限公司广州供电段,广东广州510010
出 处:《铁道技术监督》2024年第12期48-52,共5页Railway Quality Control
摘 要:针对贵广高速铁路提速改造后,在接触网弹性吊索调整数量较多的锚段内,存在的弹性吊索张力超标问题,通过模拟仿真、现场试验等方法,分析弹性吊索张力变化规律,探索符合现场实际需求的张力调整方法。在接触线张力增加前提下,将弹性吊索张力及锚段内接触线高度等参数调整至符合相关标准要求,保障改造后良好的弓网匹配关系,提升供电设备运行品质。In response to the problem of excessive tension in the elastic stitch wires in anchor sections where a large number of the elastic stitch wires of the catenary are adjusted after the speed increase and renovation of the Guiyang-Guangzhou High-speed Railway,simulation modeling,on-site tests,etc.were used to analyze the changing trend of the tension of the elastic stitch wires,and a suitable method for adjusting the tension was explored to meet the actual needs on site.Under the premise of increasing the tension of the contact line,the tension of the elastic stitch wires and the height of contact wire within the anchor section were adjusted to meet the relevant standard requirements,which can ensure a good relationship between pantograph and catenary after renovation,and improve the operating renova-tion quality of the power supply equipment.
关 键 词:高速铁路 提速改造 接触网 弹性吊索 张力 弓网关系
分 类 号:U225.48[交通运输工程—道路与铁道工程] U227.8
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222