检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Licheng Zhang Shan Li Bing Sun
机构地区:[1]State Grid Xinjiang Electric Power Co.,LTD.,Urumqi 830011,Xinjiang Uygur Autonomous Region,China [2]State Grid Xinjiang Electric Power Research Institute,Urumqi 830011,Xinjiang Uygur Autonomous Region,China
出 处:《Journal of Electronic Research and Application》2025年第1期147-156,共10页电子研究与应用
摘 要:Through an example of a main transformer switch-in with load during the reverse transmission of a 750 kV power plan,the paper introduces the basic principle of transformer switch-in with load.EMTPE program that is used to establish a calculation model,at the same time mainly considers the excitation characteristics of the transformer,the transient model of the circuit breaker,and the model of high voltage transformer,and calculated the inrush current with transformer switch-in with load in this plan.During system debugging in the plan,the two sets of main transformers passed the closing and opening test,and the data of inrush current in the test are recorded and analyzed.The simulation calculation and measured data show that the results are consistent.The simulation calculation also shows that it is not recommended to perform on-load closing of the transformer except for special circumstances,because of the influence of hysteresis characteristic when the transformer was switched in with load or the terminal voltage of the transformer resumed normal level from a low one after an external near-end fault was cleared,which various transformer differential protection using the characteristics of inrush to implement block scheme may mal-operate.
关 键 词:TRANSFORMER Switch-in with load Inrush current Ultra-saturation converter station Hysteresis characteristic EMTPE
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38