检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高聪[1] 王志强[1] 高锋[1] 孙世斌[1] GAO Cong;WANG Zhiqiang;GAO Feng;SUN Shibin(Offshore Oil Engineering CO.,LTD.,Tianjin 300452)
出 处:《化工装备技术》2025年第1期68-71,共4页Chemical Equipment Technology
摘 要:主要介绍了海洋工程项目中,质量管理与降本增效的联系,并从预防性成本、评估性成本、补救性成本、额外成本等方面探讨了质量管理对项目效益的影响。同时,提出了加强项目质量管理的建议性措施,以减少项目资源和成本支出,并提高效益。The relationship between quality management and cost reduction and efficiency improvement in marine engineering projects was mainly introduced,and the impact of quality management on project benefits was discussed from the aspects of preventive costs,evaluative costs,remedial costs,and additional costs.At the same time,suggested measures were put forward to strengthen project quality management,in order to reduce project resources and cost expenditures,and improve efficiency.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.221.72.117