地铁深基坑开挖对旁侧并行高架桥梁的影响分析  

Analysis of Influence of Deep Foundation Pit Excavation of Subway on Side Viaduct

作  者:孙波[1] SUN Bo(China Railway Siyuan Survey and Design Group Co.Ltd.,Wuhan 430063,China)

机构地区:[1]中铁第四勘察设计院集团有限公司,武汉430063

出  处:《工程建设与设计》2025年第3期18-20,共3页Construction & Design for Engineering

摘  要:以某地铁车站深基坑工程案例为背景,介绍了深基坑的设计方案,以及对旁侧并行高架桥梁的保护方案。同时,通过数值模拟,分析了地铁深基坑施工对既有高架桥梁的影响,与现场监测数据进行对比后,验证了数值分析的可靠性。结果表明,该项目基坑开挖对既有高架桥梁的影响可控,设计方案合理。In the case of deep foundation pit in a subway station,the design scheme of deep foundation pit and the protection scheme of the side parallel elevated bridge are introduced.At the same time,the influence of the deep foundation pit construction on the existing elevated bridge is analyzed,and then compared with the field monitoring data to verify the reliability of the numerical analysis.The results show that the influence of the foundation pit excavation in this project on the existing elevated bridge is controllable and the design scheme is reasonable.

关 键 词:地铁深基坑 旁侧并行 高架桥梁 MJS加固 钢支撑伺服系统 

分 类 号:U231.3[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象