近距离煤层开采底板变形控制方法研究  

Research on Deformation Control Method of Bottom Plate in Adjacent Coal Seam Mining

在线阅读下载全文

作  者:贺宏元 HE Hongyuan(Jinneng Holding Coal Industry Group Tongxin Coal Mine Shanxi Co.,Ltd.,Datong 037000,Shanxi,China)

机构地区:[1]晋能控股煤业集团同忻煤矿山西有限公司,山西大同037000

出  处:《凿岩机械气动工具》2025年第2期58-60,共3页Rock Drilling Machinery & Pneumatic Tools

摘  要:文章结合工程实例,进行底板破坏深度回归预测,预计工作面底板的最大破坏深度可达16.11 m。分析了煤层开采扰动下的底板应力与变形,并提出了底板变形控制方法,包括充填开采、注浆加固和加快推进速度。经模拟分析,充填开采技术在控制底板变形方面效果最佳。This paper combines engineering examples to carry out the regression prediction of bottom plate failure depth,and predicts that the maximum failure depth of the bottom plate in the working face can reach 16.11 m.The stress and deformation of the bottom plate under the disturbance of coal seam mining are analyzed,and the control methods of the bottom plate deformation are put forward,including filling mining,grouting reinforcement and accelerating advancing speed.Through simulation analysis,fi lling mining technology has the best effect in controlling bottom plate deformation.

关 键 词:煤层 底板变形 回归预测 支持向量机 

分 类 号:TD823[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象