检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:温良伟 Wen Liangwei(China RAILWAY 14TH BUREAU Group Co.,Ltd.,Jinan,China)
机构地区:[1]中铁十四集局集团有限公司,山东济南
出 处:《科学技术创新》2025年第8期94-97,共4页Scientific and Technological Innovation
摘 要:地铁工程常采用先站后隧的施工工序,本文提出了一种地铁车站与区间叠合同期施工的施工技术。将叠合法关键施工技术运用于北京地铁8号线三期工程土建施工03合同段的工程实践,采用数值计算和现场监测等手段评价了其施工效果,并提出了适用条件。相比传统的施工方法,叠合法施工具有施工周期短、环境适应性强等优点,对复杂条件下城市地铁建设具有一定的指导意义。The construction of subway projects often adopts the process of building stations before tunnels.This paper proposes a construction technology for overlapping construction periods of subway stations and intervals.The key construction technology of the overlay method was applied to the civil construction of Contract Section 03 of the Phase III project of Beijing Subway Line 8.Numerical calculations and on-site monitoring are employed to evaluate the construction effects and to propose applicable conditions.Compared with traditional construction methods,overlapping construction has advantages such as shorter construction periods and stronger environmental adaptability,providing certain guidance for urban subway construction under complex conditions.
分 类 号:U231.3[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49