连续特大刚构桥造桥机安拆及工艺应用  

The Installation and Dismantling of Continuous Super-Large Rigid Bridge Building Machine and Process Application

在线阅读下载全文

作  者:朱贺宇 Zhu Heyu

机构地区:[1]中铁十二局集团第四工程有限公司,陕西西安710024

出  处:《江苏建材》2025年第1期89-90,110,共3页Jiangsu Building Materials

摘  要:下文以实际工程为背景,探究了连续特大刚构桥造桥机安拆及其施工工艺。造桥机的拼装过程包括地面预拼装、梁面拼装、吊装、最终拼装和现场调试;连续刚构造桥机拆除流程主要包括:拆除内模系统及内导梁、底篮系统吊点转换、拆除前上横梁、行走系统切换、后退至可整体下放节段、安装下放锚杆、拆除C型挂腿及整体下放和地面拆除。造桥机的主要施工工艺包括预压、浇筑、走行。In the following paper,the installation and dismantling of the continuous super-large rigid bridge building machine and its construction technology are explored in the background of actual engineering.The assembly process of the bridge building machine includes ground pre-assembly,beam surface assembly,hoisting,final assembly and on-site commissioning;The dismantling process of the continuous rigid structure bridge crane mainly includes:dismantling the inner mold system and the inner guide beam,the bottom basket system lifting point conversion,the removal of the front upper beam,the switching of the walking system,the retreat to the section that can be lowered as a whole,the installation of the lower anchor rod,the removal of the C-shaped hanging leg and the overall decentralization and ground demolition.The main construction process of the bridge building machine includes preloading,pouring and walking.

关 键 词:特大桥 连续刚构 造桥机 安拆及施工 

分 类 号:TU7[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象