作 者:朱贺宇 Zhu Heyu
机构地区:[1]中铁十二局集团第四工程有限公司,陕西西安710024
出 处:《江苏建材》2025年第1期89-90,110,共3页Jiangsu Building Materials
摘 要:下文以实际工程为背景,探究了连续特大刚构桥造桥机安拆及其施工工艺。造桥机的拼装过程包括地面预拼装、梁面拼装、吊装、最终拼装和现场调试;连续刚构造桥机拆除流程主要包括:拆除内模系统及内导梁、底篮系统吊点转换、拆除前上横梁、行走系统切换、后退至可整体下放节段、安装下放锚杆、拆除C型挂腿及整体下放和地面拆除。造桥机的主要施工工艺包括预压、浇筑、走行。In the following paper,the installation and dismantling of the continuous super-large rigid bridge building machine and its construction technology are explored in the background of actual engineering.The assembly process of the bridge building machine includes ground pre-assembly,beam surface assembly,hoisting,final assembly and on-site commissioning;The dismantling process of the continuous rigid structure bridge crane mainly includes:dismantling the inner mold system and the inner guide beam,the bottom basket system lifting point conversion,the removal of the front upper beam,the switching of the walking system,the retreat to the section that can be lowered as a whole,the installation of the lower anchor rod,the removal of the C-shaped hanging leg and the overall decentralization and ground demolition.The main construction process of the bridge building machine includes preloading,pouring and walking.
分 类 号:TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49