检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:汤雪扬 蔡小培[1] 孙加林 杨飞 刘万里 TANG Xueyang;CAI Xiaopei;SUN Jialin;YANG Fei;LIU Wanli(School of Civil Engineering,Beijing Jiaotong University,Beijing 100044,China;Infrastructure Inspection Research Institute,China Academy of Railway Sciences Corporation Limited,Beijing 100081,China)
机构地区:[1]北京交通大学土木建筑工程学院,北京100044 [2]中国铁道科学研究院集团有限公司基础设施检测研究所,北京100081
出 处:《铁道学报》2025年第3期109-117,共9页Journal of the China Railway Society
基 金:国家自然科学基金(52178405);中国国家铁路集团有限公司科技研究开发计划(K2022G038)。
摘 要:高速铁路道岔区比区间线路更为复杂,其轮轨力分布特征尚不明确。基于综合检测车长期运行积累的海量数据,提出新型时频分析方法Iceemdan-Spwvd,对道岔区轮轨力进行时频分析。基于统计学理论,对轮轨力进行正态及分布差异性检验,明确其统计分布特征。结果表明:列车以300 km/h速度直顺向通过状态良好的18#非加宽道岔时,钢轨接头以及辙叉区轮载过渡引起的轮轨力平均频率范围为232~484 Hz,能量占比为21.63%~30.89%;转辙器区轮载过渡引起的横向力平均频率范围为6~15 Hz,能量占比为11.47%~19.05%;道岔区轮轨力不符合正态分布,且直基本轨侧与直尖轨侧轮轨力存在显著差异;直基本轨/尖轨侧垂向力、直基本轨/尖轨侧横向力的95%累计概率分布值分别为65.0、67.7、3.6、4.1 kN。The high-speed railway turnout areas are more complex than the main lines,with their unclear wheel-rail force characteristics.Based on the massive data accumulated from the long-term operation of high-speed comprehensive inspection trains in China,a new time-frequency analysis method,Iceemdan-Spwvd,was proposed to perform time-frequency analysis of wheel-rail forces in turnout areas.Based on statistical theory,normality and distribution difference tests were conducted on the wheel-rail forces to clarify their statistical distribution characteristics.The results show that,when the train passes through a well-maintained 18#unwidened turnout at a speed of 300 km/h,the average frequency range of the wheel-rail force caused by wheel load transition in the frog crossing area and rail joints is 232~484 Hz,with an energy ratio of 21.63%~30.89%.The average frequency range of lateral wheel-rail force caused by wheel load transition in the switch area is between 6~15 Hz,with an energy ratio of 11.47%~19.05%.The wheel-rail force in the turnout area does not conform to a normal distribution,and there is a significant difference between the wheel-rail forces of the straight switch rail and the straight base rail.The 95%cumulative probability distribution values for the vertical force on the stock rail side/switch rail side,and the lateral force on the stock rail side/switch rail side are 65.0、67.7、3.6、4.1 kN,respectively.
关 键 词:高速道岔 轮轨力 Iceemdan-Spwvd 核密度估计
分 类 号:U213.6[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.26