检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何维维 张天旺 张子华 赵润林 崔志鑫 傅洪贤[2] 王颖怡 李函 He Weiwei;Zhang Tianwang;Zhang Zihua
机构地区:[1]中铁三局集团桥隧工程有限公司,北京市100044 [2]北京交通大学土木建筑工程学院
出 处:《工程机械》2025年第4期162-170,176,I0008,共11页Construction Machinery and Equipment
摘 要:为实现西康高铁太兴山隧道安全、快速、高质量建设,减轻作业人员的劳动强度,开展单线隧道机械化配套的研究。根据现场的施工流程,将机械化配套分为5条作业线,对每条作业线上的机械化施工人机资源进行合理的配套,提高了机械化施工的技术含量,使机械设备在对应的施工环节充分发挥,形成了一套完整单线隧道机械化配套施工工艺。To realize safe,fast and high-quality construction of the Taixingshan tunnel of Xi’an-Ankang high-speed railway and reduce labor intensity of operators,the mechanized supporting for single-line tunnels is studied.According to the onsite construction process,the mechanized supporting is divided into five operation lines,and the mechanized construction man-machine resources on each operation line are reasonably matched,which enhances the technology of mechanized construction,allows full play of the mechanical equipment in the corresponding construction links and forms a complete set of mechanized supporting construction process for single-line tunnels.
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49