检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈凯 黄功伟 CHEN Kai;HUANG Gongwei(PowerChina Jiangxi Electric Power Engineering Co.,Ltd.,Nanchang 330006,China)
机构地区:[1]中国电建集团江西省电力设计院有限公司,江西南昌330006
出 处:《电力勘测设计》2025年第4期53-60,共8页Electric Power Survey & Design
摘 要:文章针对高比例海上风电接入的电力系统后调峰能力不足,设计“源网荷储”调度优化模型,通过对历史风力数据的分析和预测,配置储能站协同系统中发电侧、电网侧和负荷侧进行调峰。仿真结果表明:“源网荷储”调度优化模型能够提升电力系统整体的调度强度和频率,提高海上风电机组的消纳水平,同时降低整个系统的运行成本。Aiming at the lack of peak regulation capacity of power system with high proportion of offshore wind power,a“source-grid-load-storage”scheduling optimization model is designed.Through the analysis and prediction of historical wind data,the peak regulation of power generation side,power grid side and load side in the energy storage station cooperative system is configured.The simulation results show that the“source-grid-load-storage”scheduling optimization model can improve the overall scheduling intensity and frequency of the power system,improve the consumption level of offshore wind turbines,and reduce the operating cost of the entire system.
分 类 号:TK01[动力工程及工程热物理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7