检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周伟[1] 李长征 赵华 Zhou Wei;Li Changzheng;Zhao Hua(Jiangsu Provincial Traffic Engineering and Construction Bureau,Nanjing 210000,China;China Communications First Highway Survey,Design and Research Institute Co.,Ltd.,Xi’an 710000,China)
机构地区:[1]江苏省交通工程建设局,南京市210000 [2]中交第一公路勘察设计研究院有限公司,西安市710000
出 处:《北方交通》2025年第4期1-6,共6页Northern Communications
摘 要:泗蚌高速起点段落穿越洪泽湖滞洪区,与新扬高速设置双沟枢纽互通立交。通过比选起点枢纽桥梁、路基方案和桥梁跨径,阐述了双沟枢纽全桥方案的合理跨径。研究了双沟枢纽、T型枢纽和预留改造十字型枢纽,认为此类预留工程采用“一次设计,分期建设”的思路更为节约。The starting section of the Sibang expressway crosses the flood detention area over Hongze lake,and it is connected to the Shuanggou hub interchange of the Xinyang expressway.By comparing and selecting the hub bridge at the starting point,subgrade scheme and bridge span,the reasonable span of the full bridge scheme for the Shuanggou hub is elaborated.The Shuanggou hub,T-shaped hub,and the reserved upgrading cross-shaped hub are studied.It is believed that the idea of"one-time design,phased construction"is more cost-effective for such a reserved project.
分 类 号:U412.352.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49