三峡工程对嘉陵江朝天门至井口河段的影响及治理研究  被引量:2

Numerical simulation of sediment deposition at Chaotianmen- Jingkou reach of Jialing River in Three Gorges Project

在线阅读下载全文

作  者:杨胜发[1] 赵志舟[2] 方铎[1] 周华君[2] 王绍成 

机构地区:[1]四川大学高速水力学国家重点实验室,四川成都610065 [2]重庆交通学院河海工程系,重庆400074

出  处:《水动力学研究与进展(A辑)》2002年第5期586-591,共6页Chinese Journal of Hydrodynamics

基  金:国家自然科学基金委员会;水利部联合资助项目 (5 9890 2 0 0 )

摘  要:本文建立水沙运动二维数学模型 ,通过实测水面线、流速分布及其泥沙冲淤变化过程与模型计算值进行比较 ,其值吻合较好。运用该数模计算了嘉陵江朝天门至井口河段在三峡工程运行八十年内的泥沙淤积情况并提出治理工程方案 ,预测了方案前后河段的河床演变以及港口、航道的泥沙淤积 ,选择出合理的治理方案。In this paper, variations of sediment deposition in the coming 80 years for the Jialing River at the Chaotianmen-Jingkou reach of the Jialing River, caused by the Three Gorges Project, were analysed by means of a two-dimensional water and sediment numerical model and tested through measurable water surface, flow velocity and river bed change. The river bed change and sediment deposition of that part were predicted. A reasonable project of dredging was proposed.

关 键 词:数值模拟 三峡工程 泥沙淤积 

分 类 号:TV145[水利工程—水力学及河流动力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象