官厅水库妫水河口拦门沙疏浚的数值模拟研究  被引量:3

Numerical Simulation on Dredging Channel of Guishui River Mouth Bar of Guanting Reservoir

在线阅读下载全文

作  者:张燕菁[1] 张世奇[1] 陈金荣[1] 

机构地区:[1]中国水利水电科学研究院泥沙研究所,北京100044

出  处:《泥沙研究》2003年第1期45-51,共7页Journal of Sediment Research

摘  要:利用一、二维嵌套的不平衡输沙数学模型 ,对官厅水库妫水河口拦门沙疏浚挖槽方案进行了数值模拟 ,分析了影响挖泥槽回淤的各种因素 ,并通过对几种典型的挖槽方案进行计算分析 ,提出了合理的疏浚挖槽方案。Several dredging plans have been conducted by the mathematical model.The simulated results show that the amount of silt in the dredged channel could be affected by the oncoming flow and sediment, the relative position between the channel and the mouth, and the operation water level of Guanting reservoir. To restore the water supply to Beijing city, it is suggested that the dredging plan of 15~50m wide dredge channel should be implemented in the current project. In the future, a 300m wide dredge channel should be applied. In the permission of cost, it would be better to take both measurements of dredging channel and training dike.

关 键 词:妫水河口 拦门沙 泥沙数学模型 疏浚 挖泥槽 回淤量 数值模拟 官厅水库 

分 类 号:TV85[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象