检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周晋筑
机构地区:[1]中铁五局青藏铁路指挥部,青海格尔木816000
出 处:《冰川冻土》2003年第1期106-111,共6页Journal of Glaciology and Geocryology
摘 要:介绍了高原多年冻土世界第一长隧道———昆仑山隧道洞内防排水及衬砌隔热保温层的设计特点 ,通过材料性能优选和工艺试验 ,选定了适宜于高原多年冻土隧道洞内防排水及衬砌隔热保温层施工的材料 ,并制定科学、合理的施工方法和工艺 ,确保昆仑山隧道工程质量 .Kunlunshan Tunnel on Qinghai-Tibet Railway, 1686m in length, the world longest permafrost tunnel on plateau ({4 600}~{4 800} m in elevation), is situated in permafrost region. Because of its special geography, harsh nature environment and complicated geological condition, water-proof/drainage and heat insulation for the tunnel are highly demanded. However, no successful experience for water|proof/drainage and heat insulation in such tunnels can be founded both at home and abroad, since the conventional methods cannot meet the needs of the tunnel construction. Hence, it becomes a typical and key structure for the design, construction technology and quality control. In this paper, the design characteristic of water-proof/drainage and heat insulation for plateau permafrost tunnel is put forward, which is laid between the initial lining supporting and final lining supporting with a structure of !compound water-proof plate plus heat insulation plate plus compound water-proof plate'. In order to ensure good quality of the tunnel, heat insulation materials like non-woven cloth and /PVC compound water-proof plate, PU polyurethane plate, type TN-1 polyurethane adhesion agent, OP resin emulsion are selected as the lining material for water-proof/drainage and heat insulation. They are frequently tested and selected in accordance with the needs and requirements of construction of plateau permafrost tunnel. In order to get an ideal result of water-proof and heat insulation, with no nails, water-proof plates are double-seams welded with thermo-welder, and heat insulation plates are sticked together with type TN-1 polyurethane adhesion agent. As reasonable construction method and technology such as water-proof/drainage and heat insulation lining is adopted in this tunnel, the quality of tunnel construction is guaranteed.
关 键 词:昆仑山 隧道 青藏铁路 多年冻土 防排水 隔热保温层 施工技术
分 类 号:U455.4[建筑科学—桥梁与隧道工程] U459.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43